| Production Geology and Geophysics for Asset Management Room 3 Co-Chairs: P. Ryles and K. J. Wulff |
|
| Introductory Remarks | |
| B. Hornby, O. I. Barkved, S. Knudsen, F. X. Bostick, B. Williams: Reservoir Monitoring Using Permanent in-Well Seismic | |
| H. S. Moestopo, G. Jacobs, K. E. Purwanto, B. Nursyahid: Improving Recovery Factors in Central Sumatra Basin Indonesia Shaly Sand Reservoirs by Horizontal Drilling | |
| P. P. Thomas: The "Cossack Pioneer" Oil Fields: New Subsurface Insights after Eleven Years on Production | |
| J. D. Johnson, M. La Prea, C. Eckersley, P. M. Lloyd: Technical Competency Assessment: A Strategy to Optimize the Value of Human Resource Assets | |
| B. McKinstry, J. Lee, P. Gagnon, R. Wade: A Global Toolkit for Maximizing Production from Shallow Litharenite Gas Reservoirs: A Case History from the Vidora Field, Southwest Saskatchewan, Canada | |